Ongoing and Forthcoming Roadworks

This page is intended to summarise roadworks and traffic restrictions based on the information we receive from Via, Highways England and other organisations. Although we endeavour to ensure the information is accurate, we cannot be held responsible for any errors or omissions.

Roadworks and Traffic Restrictions

  • Lane Closures – Saxondale Roundabout, Bingham, 2nd to 28th September

    Lane closures will be in effect on the approaches to the Saxondale Roundabout from Nottingham Road and B692, Tithby Road junctions with the A52 both north and south, overnight from 8:00 PM to 6:00 AM, starting Monday, 2nd September 2024 until Saturday, 28th September 2024. These closures are necessary for National Highways to facilitate the changing of street lighting to LED. For more details, please refer to the attached document.

  • Temporary Traffic Signals – Chapel Lane, Bingham, 2nd September

    Temporary two-way traffic signals will be in operation on Chapel Lane, Bingham, approximately 200 meters south of its junction with Moorbridge Road, from 8:00 AM to 5:30 PM on Monday, 2nd September 2024. These signals will be manually controlled at all times to ensure smooth traffic flow while BT installs a new telecom pole. For more information, please refer to the attached document.

  • Temporary Traffic Signals – Chapel Lane, Bingham, 11th to 12th August

    Temporary multi-way traffic signals will be in operation on Chapel Lane, Bingham, approximately 5 meters north of its junction with Moorbridge Road, continuously from Sunday, 11th August 2024 to Monday, 12th August 2024. These measures are necessary for Severn Trent Water to install a new hydrant in the carriageway. For more information, please refer to the attached document.

  • Temporary Traffic Signals – Chapel Lane, Bingham, 13th to 15th August

    Temporary two-way traffic signals will be in operation on Chapel Lane, Bingham, just south of the roundabout to Dunsmore Avenue, continuously from Tuesday, 13th August 2024 until Thursday, 15th August 2024. These measures are necessary for Severn Trent Water to install a new hydrant. For more information, please refer to the attached document.

  • Temporary Traffic Signals – Willow Road, Bingham (Junction with Grantham Road), 26th August to 6th September

    Temporary multi-way traffic signals will be in operation 24 hours a day at the junction of Willow Road and Grantham Road, Bingham, from Monday, 26th August 2024 until Friday, 6th September 2024. These signals are necessary to facilitate Cadent’s gas mains replacement works. For further details, please refer to the attached document.

  • Temporary Traffic Signals – Chapel Lane, Bingham, 30th July

    Temporary two-way traffic signals will be in place on Chapel Lane, Bingham, approximately 100 meters south of Moorbridge Road, from 8:00 AM to 5:30 PM on Tuesday, 30th July 2024. These signals will be manually controlled throughout the works to facilitate the installation of a new BT pole. For more information, please refer to the attached document.

  • Temporary Traffic Signals – Chapel Lane, Bingham, 23rd to 25th July

    Temporary two-way traffic signals will be operational on Chapel Lane, Bingham, approximately 100 meters south of its junction with Burrows Drive, continuously from Tuesday, 23rd July 2024 to Thursday, 25th July 2024. These measures are necessary for Severn Trent Water to undertake a hydrant renewal. For more details, please refer to the attached document.

  • Temporary Traffic Signals – B692 Fosse Way, Bingham, 15th to 16th July

    Temporary two-way traffic signals will be in place on B692 Fosse Way, Bingham, approximately 470 meters south of its junction with Dunsmore Avenue, continuously from Monday, 15th July 2024 to Tuesday, 16th July 2024. These signals are necessary for conducting trial holes. For more information, please refer to the attached document.

  • Temporary Traffic Lights – Fosse Way (200m SW from Saxondale Roundabout), 6th to 7th of July

    Multi-way temporary traffic signals will be in operation 24 hours a day on B692 Fosse Way, Bingham, spanning approximately 200 meters in a southwesterly direction from the Saxondale Roundabout, from Saturday the 6th of July until Sunday the 7th of July. This is to facilitate Connexin performing duct testing along the carriageway verge. Please see the attached document for further information.

  • Temporary Traffic Lights – Fairfield Street (at its Junction with Long Acre), 2nd to 4th of July

    Multi-way temporary traffic signals, manually controlled during peak times to optimize traffic flows, will be in operation 24 hours a day on Fairfield Street, Bingham (at its Junction with Long Acre) from Tuesday the 2nd of July until Thursday the 4th of July. This is to facilitate Connexin using Openreach chambers for testing. Please see the attached document for further information.