Temporary traffic signals will be in place on Mallow Way (50m east of Tansy Way junction) from the 19th of November until the 22nd of November. Please see that attached document for further information.
Documents
-
Temporary traffic signals at Kirk Hill/Carnarvon Close Jct, 7th November
Temporary traffic signals are in place at the junction of Kirk Hill and Carnarvon Place due to emergency work to replace a dangerous telegraph pole. Please see the attached document for further information.
-
Temporary traffic lights on Chapel Lane, 31st October, 1st November
Temporary traffic lights will be in place on Chapel Lane (approx. 300m north of Kirkhill Level Crossing) on the 31st of October and the 1st of November in order to fix a water leak. Please see the attached document for further information.
-
Roadworks on A52/Grantham Road Radcliffe-on-Trent, January-March 2020
Essential drainage works are due to be carried out on the A52/Grantham Road at Radcliffe-on-Trent between January and March 2020. A mixture of temporary traffic lights and road closures will be required during the works and there will be a 30mph speed limit.
Please see the attached documents for further information, including diversion routes.
-
Two-way traffic signals on Grantham Road, 4th-8th of November
Two-way traffic signals will be in place on Grantham Road (between The Banks and Long Acre East junctions) between 9:00am and 3:30pm from Monday the 4th of November through Friday the 8th of November. Please see the attached document for further information.
-
Extra-Ordinary Policy & Resources Meeting
Tuesday, 29th of October 2019 at 7:00pm
-
Road closures during the Bingham Remembrance Day Parade, 10th November
On Sunday the 10th of November, the following roads will be closed for the Bingham Remembrance Day Parade:
- Newgate Street – between the entrance to Eaton Place car park and its junction with Moor Lane
- Market Street – between its junctions with Newgate Street and Moor Lane
- Market Place – for its entire length
- Church Street – between its junctions with Market Place and Cherry Street
- Cherry Street – between its junctions with Long Acre and Church Street
The roads will be closed between 10:25-10:40 and 11:50-12:05. Times are approximate. Please see the attached document for further information.
-
Temporary traffic signals on Mallow Way, 29th October through 1st November
Temporary two-way traffic signals will be in place on Mallow Way (approximately 50m east of its junction with Tansy Way) between Tuesday the 29th of October and Friday the 1st of November. Please see the attached document for more information.
-
Old Fosse Way Island slip road lane closure, 25th October through 7th November
The slip road from the Old Fosse Way Island on to Chapel Lane will be closed between Friday the 25th of October and Thursday the 7th of November. Please see the attached document for further information.
